Solution pH and ALS2 Selectivity for Gold Over Base Metals
Australia is good at putting precious metal into the ground and, increasingly, into the household. Gold-bearing circuit boards, connector pins and catalytic converters pass through a national stream of electronic waste running to tens of thousands of tonnes each year, and much of that value still leaves the recovery chain at the point where it becomes an input to an overseas refinery. Pulling gold from that material without dragging copper, nickel, zinc and iron along with it is the central technical problem.
That is where solution pH becomes the most useful control variable in an ALS2 circuit. Ikoi S.p.A.'s acidless separation technology, developed with support from the European Union's Horizon 2020 research and innovation programme, aims to recover precious metals from electronic waste and WEEE streams without the corrosive acid baths that dominate conventional refining. Understanding how pH shifts ALS2 selectivity for gold over base metals explains both the promise of the process and the operating discipline it demands of a compact plant.
Why pH Decides Which Metals Dissolve
Every metal in the feed has its own hydrolysis curve, and those curves decide what stays in solution and what drops out as a solid. Iron and aluminium hydrolysise earliest and most aggressively, so they start forming insoluble hydroxides at comparatively low pH. Copper, zinc and nickel follow at higher pH, and gold complexed with a suitable ligand resists precipitation across a broad working range. Raise the pH carefully and base metals lock themselves into residue while the gold species remains dissolved.
Conventional acid refining works at the opposite end of the scale. Strong acid and oxidant dissolve almost everything, selectivity is recovered later through staged precipitation and solvent extraction, and the plant then carries the cost of heating, corrosion control, fume capture and neutralisation. An acidless route is designed to operate in a milder window from the outset, so unwanted metals never enter the pregnant leach solution in the first place.
For an operator, that difference appears in three places: reagent consumption per tonne of feed, the volume of slurry that has to be filtered and settled, and the number of downstream separation stages required before a saleable gold product can be produced. Tighter pH control also makes the process easier to model, which matters when the plant is a skid sitting on a constrained urban or regional site rather than a purpose-built refinery.
The Chemistry Behind the Selectivity Window
Selectivity in an ALS2 circuit is a contest between the gold complex and the base metal ions for the same solution. Complexant stability, oxidant availability, reaction kinetics and pH all pull on the outcome at once, and small shifts in any of them show up quickly in assay results. A well-run plant tracks the operating point with conventional probes and laboratory checks rather than relying on setpoints alone.
The comparison below summarises how the pH regime shapes dissolution behaviour across the metal group, from strongly acidic conditions to the mildly alkaline window in which ALS2 operates.
| pH regime | Dominant chemistry | Gold behaviour | Base metal behaviour | Selectivity outcome |
|---|---|---|---|---|
| Below pH 2 | Excess protons suppress hydroxide formation | Dissolves readily with oxidant | Cu, Ni, Zn and Fe dissolve almost completely | Low selectivity; separation deferred to later stages |
| pH 2 to 5 | Progressive hydrolysis of the earliest metals | Complex remains stable given adequate complexant and oxidant | Iron and aluminium precipitate first, then copper begins to drop out | Moderate selectivity with staged base-metal removal |
| pH 6 to 8.5 | Alkaline window typical of acidless operation | Gold complex stays in solution | Cu, Zn, Ni and Fe held in insoluble hydroxides and oxides | High selectivity; low reagent demand and no free acid handling |
| Above pH 9 | Strongly alkaline, amphoteric dissolution risk | Hydrolysis and re-precipitation losses become possible | Aluminium and zinc can partially redissolve as complexes | Diminishing returns; tighter control needed |
Monitoring practice follows the chemistry. Operators titrate to the target pH, track oxidation-reduction potential, and sample the leach liquor at fixed intervals for metals such as copper, iron, nickel and zinc by ICP or atomic absorption. Gold-to-copper selectivity ratio, rather than gold recovery on its own, is the figure that tells a plant manager whether the circuit is running where it should.
Reading Selectivity in a Real WEEE Stream
The laboratory feed is tidy. A WEEE processing line is not. A single shredder output can combine gold-plated connector contacts, copper busbars, nickel plating, aluminium heat sinks, tin and lead solder, tantalum capacitors and brominated flame-retardant board laminate in the same bucket. That variability is precisely why pH control cannot be treated as an afterthought bolted onto a fixed recipe.
A practical approach is staged. The leach is held in the ALS2 window so that base metals precipitate as solids, the residue is filtered and washed to recover entrained gold, and copper-rich liquor fractions are handled separately from the gold-bearing solution. Where a stream contains unusually high copper, such as cabling or motor windings stripped before shredding, pre-separation by sorting or a rougher physical step can save reagent and shorten residence time.
The metrics that matter to a plant owner follow from this. Pay attention to the mass of base metals reporting to residue, the grams of gold per tonne in the final product, complexant consumption, and the number of operating days between media replacement. A process that extracts 95 per cent of gold but drags iron into the product stream pays a penalty at the refinery, while a process that extracts slightly less gold but delivers a clean, low-copper doré is usually worth more in the end.
Operating a Compact Precious-Metals Plant
ALS2 has been positioned for compact precious-metals recovery plants that can be installed alongside an existing e-waste collection and dismantling operation. The equipment footprint is modest, the reagent list avoids bulk mineral acids, and the plant does not require the dedicated acid storage, fume extraction and large spill containment infrastructure that regulators and site operators treat as barriers to entry. Plants near Melbourne, Sydney or Brisbane can therefore be sized to the throughput of a municipal collection rather than to a regional smelter's feedstock.
Running such a unit means paying attention to small details. Lime or sodium hydroxide dosing sets the pH, and dosing too coarsely wastes reagent and overshoots the window, so metering pumps and mixing deserve capital budget. Tanks and piping avoid the heavy corrosion allowances of acid service, but electrical components still need protection from a wet, conductive environment, and a closed-loop water circuit reduces both water draw and wastewater volume in a dry Australian summer.
Labour is another factor. A compact site near Adelaide or Perth cannot assume a trained hydrometallurgical operator is available locally, so control philosophy matters as much as chemistry. Remote monitoring, automated dosing with manual titration checks, and clear handover documentation keep a two- or three-person crew in control of a process whose performance depends on a narrow operating band.
Australian Feedstocks, Customs and Market Conditions
Australian electronics recycling is unusually well organised at the collection end. National schemes such as the Mobile Phone and Television Recycling programme run by ERM, state-level programs including TechCollect in New South Wales, and municipal drop-off networks across Melbourne, Brisbane and Perth together handle large volumes of phones, laptops, displays and batteries. Circuit boards from business and government refurbishment streams are particularly attractive, because they arrive concentrated rather than diluted across general municipal waste.
Movement of that material across borders carries real friction. The Export Waste and Import Waste frameworks administered through the Department of Climate Change, Energy, the Environment and Water, together with Australian Border Force customs declarations, mean that e-waste, gold-bearing residues and metal-bearing slags must be correctly classified and permitted before shipment. Exporting non-hazardous waste offshore attracts the Western Australian Waste Export Levy, which adds a direct cost to any business model that depends on shipping low-value residues rather than processing them locally.
On the revenue side, the Australian gold price in Australian dollars, linked to the international spot market and traded through local bullion dealers, makes every gram recovered worth chasing. Australia remains one of the world's largest gold producers, with Kalgoorlie in Western Australia and the Tanami and Cadia operations central to national output. Refiners pay for purity, and base-metal carryover in a doré or gold powder reduces payable content and can trigger additional treatment charges, which turns selectivity data directly into margin.
Partnering With Ikoi on the ALS2 Project
Ikoi is building an evidence base for ALS2 across European and international partners, and the project benefits from the documentation, dissemination and industrial validation support associated with Horizon 2020 funding. Australian input is valuable because the feedstock profile differs from European WEEE, the regulatory treatment of e-waste exports differs again, and the market price of gold in Australian dollars sets a demanding cost benchmark for any recovery route.
Beyond formal research work, the team has used creative formats to build interest among stakeholders and the public, including the casino leaderboard competition hosted on the project site, which pairs awareness-building with an element of engagement around the underlying technology.
The pH window is already mapped and the core chemistry is understood. What the project needs now is an industrial partner willing to run a trial on Australian electronic waste, supply representative samples and put real cost and selectivity figures behind the laboratory data. Contact the ALS2 project team through the project website to propose a pilot, request the technical dossier, and arrange a site visit to a compact plant in operation.