Recovering gold from solder-bearing power supply inductors
Recovery of gold from solder on through-hole inductors in power supplies is a consequential branch of urban mining. These components sit inside computers, monitors, chargers, industrial controls and renewable-energy equipment, where their leads and terminals are fixed to boards with solder. The solder can contain valuable metal, although the winding is usually copper and not every inductor carries commercially significant gold. The objective is to identify gold-bearing parts, liberate them without losing metal and process a concentrated stream rather than an entire electronic assembly.
ALS2Project is Ikoi S.p.A.’s dedicated home for an acidless separation technology aimed at recovering precious metals from electronic waste and waste electrical and electronic equipment (WEEE). The approach is presented as a safer, cleaner alternative to conventional acid-based refining, with an emphasis on compact recovery plants suited to decentralised sites. Backed by the European Union’s Horizon 2020 research and innovation programme, the project links technical development with measurable sustainability goals. For solder-rich feed, that support could provide the bridge from laboratory recovery to a practical, repeatable collection-and-processing service.
For Australian operators, the opportunity begins in familiar places: the office fit-out clearing racks in Sydney, the repair bench in Melbourne, and the household drawer where an old power brick has lived for years. Australians often call such items “old bits and bobs” or “an old heap”, but a discarded charger can still be a useful source of concentrated material. Commercial IT replacement, refurbishment activity and imported electronics create steady mixed streams, while consumer stockpiling in garages and cupboards delays recovery. Each route needs a process that can accept variability without demanding perfect feed sorting.
The commercial setting is equally Australian. WEEE is managed through state and territory rules, approved recycler networks and producer responsibility arrangements rather than one uniform national market. Meanwhile, freight across a country of vast distances can erase the value of a small load of metal, so a compact plant near urban waste sources matters. The contrast with Western Australia’s gold-mining industry is striking: mined ore may earn its transport because of scale and grade, whereas a desktop power supply contains only a trace of recoverable gold. Better separation turns that trace into something worth handling locally.
A concentrated feed in a mixed waste stream
Through-hole inductors are relatively easy to recognise once a power supply is opened, but their condition varies widely. They remain common in older or specialist equipment, where soldered mounting pins accompany windings of enamelled copper wire. Some sit alongside heatsinks, transformers, capacitors and circuit boards coated with flux and dust. A responsible recovery line first removes hazardous energy-storage components and addresses residual charge before mechanical dismantling. Only after safe depopulation should staff remove inductors, because separating a valuable component does not justify exposing workers to stored electrical energy.
Australian collection can improve consistency by working with refurbishment businesses, IT asset disposal firms and certified e-waste aggregators in Melbourne, Brisbane, Adelaide and Perth. These partners already know how to separate devices for reuse, parts harvesting or recycling. Power supplies from office upgrades are particularly interesting because batches may contain similar board designs and soldering practices. Household and small-business material is more fragmented and may arrive with unknown provenance. A practical feed policy should accept both while recording device type and component condition so process yield can be compared.
Machine vision can support this sorting stage, but it should remain an aid rather than a substitute for trained dismantling. The operational lessons in machine vision guidance for solar-component recognition illustrate the value of repeatable classification under changing conditions. Camera-selected parts still need quality checks, and a false positive can expose the next process to unexpected residues. The strongest design combines visual recognition with weight checks, operator verification and a feedback loop that records missed inductors.
Preparing inductors for precious metal recovery
Once components are segregated, preparation determines how much gold-bearing solder reaches the separation stage. Inductors must be dismantled without crushing the solder indiscriminately, and copper windings should be kept separate from the target fraction. Small tools or carefully adapted machinery can remove leads, terminals and soldered contacts while preserving metal fines. Fine solder particles are easy to lose on benches, conveyors or floors, so enclosed collection and dust control are basic operational requirements. A line that looks tidy in a demonstration can still suffer poor recovery if housekeeping is treated as secondary.
Process development should compare several preparation routes at component scale. Testing may examine thermal removal, mechanical liberation or a combination, with each option assessed for gold retention, copper contamination, energy demand and operator exposure. No sample should be accepted simply because it is labelled inductors: composition, solder type and prior repair history can change the result. X-ray fluorescence or other screening may assist triage, but laboratory assay remains necessary for a defensible mass balance. That evidence turns recovery into a measurable operation rather than an estimate.
The next step is a controlled feed to the acidless separation technology developed under ALS2Project. Depending on the validated route, the process can produce a precious-metal-bearing concentrate that requires appropriate downstream finishing, rather than promising finished gold from an untreated component. That distinction protects both technical credibility and commercial planning. Operators need to know the product specification, reject rate, recovery percentage and safe handling requirements for every intermediate. They also need clear stop criteria so unusual boards or contaminated batches are diverted before they affect yield.
Why acidless separation changes the economics
Acid-based refining can achieve high recovery, but it also brings corrosive reagents, liquid effluents, permitting obligations and worker-exposure risks. An acidless alternative seeks to reduce those burdens by separating valuable material through a different route. For urban facilities, the advantage is not merely a chemistry label. Lower chemical handling can simplify siting near collection hubs, while a modular design can support staged capacity as volumes grow. The case must still be proven through full mass balances, including water, energy, reagent use where applicable and the treatment of residual fractions.
Economics improve when the unit being processed is small and the target is concentrated. Traditional e-waste facilities often earn most of their value from bulk copper, aluminium and steel, leaving precious metals dispersed among large, heterogeneous flows. A process aimed at gold-bearing inductors and comparable components can create a richer feedstock, but it must recover enough value per kilogram to cover collection, dismantling, safety controls and transport. Compact plants are particularly valuable in Australia because they can be located near major urban generators and avoid long-haul movement of low-value material.
Sustainability reporting should connect every technical claim to a decision. Useful indicators include the share of inductors recovered from collected devices, grams of gold-bearing product per tonne processed, water consumed per kilogram of feed and the percentage of residues sent to verified downstream routes. Lifecycle boundaries must be stated so reduced reagent use is not offset by extra transport or repeated manual handling. ALS2Project’s clean-technology objective becomes commercially credible when customers can compare those figures with conventional refining, rather than when it remains a broad promise.
Designing recovery around Australian conditions
In Australia, deployment will be strongest where the project aligns with state-level e-waste pathways and the existing network of approved recyclers. A separation unit is not a licence to accept waste, so site approval, electrical safety, hazardous-component controls and transport documentation still need local attention. In New South Wales, Victoria and Queensland, operators must check the applicable scheme and waste-handling requirements; other states and territories have their own arrangements. Designing the plant as a permitted downstream stage makes partnerships easier and reduces the risk of creating a competing collection channel.
The most promising partners can combine complementary capabilities. E-waste organisations provide compliant streams and community trust; repair and refurbishment firms can remove components before disposal; component specialists can identify likely gold-bearing assemblies; and accredited precious-metal refiners can finish the concentrate. Universities or technical institutes can support assay, worker training and process verification. Perth’s mining-technology ecosystem offers useful engineering experience, while Sydney and Melbourne provide dense electronics markets. The lesson from Australian mining is that small-scale recovery becomes dependable when sampling, maintenance and accountability are built into routine work.
Operations should be designed for the workforce actually available. WEEE handling requires careful induction, supervision and competency records, while power-supply dismantling adds exposure to sharp metal, solder residue and unexpected energised parts. A compact skid can simplify training if the sequence is clear and access to hazardous areas is controlled. Automation must not obscure responsibility for quality. Trained operators should approve batch release, investigate contamination and stop the line when the feed changes. Those behaviours protect recovery rates, workers and the reputation of the recovered material.
Move from pilot to operational recovery
ALS2Project offers a practical route for testing whether acidless precious-metal separation can work with real power supplies rather than idealised samples. A pilot should begin with a representative quantity of inductors collected through an Australian partner, followed by controlled dismantling and feed characterisation. Sampling should distinguish gold-bearing solder and gold-plated terminations from ordinary leaded solder and copper, with each batch traceable to its source. The result will be more useful than a single recovery percentage because it will show how variability in age, repair history and component design affects preparation time, product yield and working capital.
Potential partners can contribute in several ways: host equipment, supply compliant feed, provide laboratory analysis, support safety planning or join a technology demonstration. The project team can then define acceptance criteria for recovery, concentrate quality, worker exposure, energy use and residual handling. Commercial participants can model realistic collection costs and transport distances, while research partners can test repeatability across batches. This collaborative structure turns the technical work into an implementation package that can be evaluated for scaling beyond a single site.
Contact ALS2Project to discuss a pilot feed, a site-suitability review or a technical workshop for Australian e-waste and power-supply recovery operations. Bring representative power supplies, target throughput and current collection routes so the team can map feedstock, separation requirements and measurable benefits before equipment is committed. The next step is a defined trial with agreed assays, safety controls and commercial criteria, creating evidence for a compact, acidless recovery pathway built around the gold in solder-bearing inductors.