Recovering gold from pogo-pin test fixtures with ALS2

A retired electronics test fixture can look like scrap: a board crowded with probes, springs, clamps and weathered connectors. Yet the spring-loaded pogo pins used to make temporary electrical contact may carry gold on small contact surfaces. Understanding how ALS2 processes gold from spring-loaded pogo pins in test fixtures reveals why carefully dismantled fixtures can become a meaningful precious-metals feedstock rather than a disposal cost.

When a connector-rich board is discarded as one item, its gold-bearing contacts are diluted by plastic, steel and base metals. ALS2Project’s acidless separation technology is intended to recover precious metals from electronic waste and waste electrical and electronic equipment (WEEE) recycling streams without relying on the mineral-acid leaching commonly associated with conventional refining. Its modular approach is particularly relevant to compact precious-metals recovery plants that receive sorted material from multiple collection points.

A valuable stream hidden in obsolete fixtures

A pogo-pin fixture is a small bridge between a device under test and a circuit board. Each spring-loaded pin combines a compliant metal spring with a conductive tip, often plated with hard gold over nickel, copper or another base metal. A fixture may also contain ordinary plated contacts, relays, edge connectors and plastic carriers, so the first task is identification rather than bulk processing.

The best candidates are obsolete, damaged or surplus fixtures whose connectors are unlikely to return to service. Specialist distributors such as Cavendish Instruments show the range of probing, contact and alignment hardware that can pass through a repair or laboratory network. Before separation, XRF screening, coating records or a small assay can confirm where gold is present and prevent valuable reusable parts from being unnecessarily destroyed.

Sorting also creates a practical feedstock. One drawer of mixed probes may be mostly nickel and steel, while a batch of high-contact-density pogo pins can justify dedicated treatment. Weight, connector type and known plating grade provide the first mass-balance data; fire assay or ICP analysis provides the final check on gold content and helps determine whether the stream merits a pilot.

Preparing fixtures for ALS2 separation

Safe preparation begins with controlled dismantling rather than chemical attack on an intact fixture. Inventory each assembly, remove housings and label nearby boards so that probe modules, connectors and unrelated components are not commingled. Pogo springs can store energy and may eject when released, while aged coatings can chip. Mechanical handling therefore needs appropriate tools, eye protection, restraint for moving assemblies and a capture method for loose dust.

Once the housing and boards are removed, operators can separate the gold-plated contact assembly from the spring and pin body as far as practical. Fine cutters, cable strippers or approved depinning tools can liberate pins without smearing the valuable coating. Blasting is less attractive because it can disperse gold-bearing particles and mix copper, nickel and steel residues. The aim is a small, consistent contact fraction that can be dosed accurately.

Each batch should be weighed and assigned a source record covering the fixture type, expected gold finish, dismantling date and observed contamination. Representative samples should then be tested before the remaining material is treated. This preparation protects process stability, improves traceability and supplies the baseline needed to compare recovered gold with the original assay.

How ALS2 separates the gold

In a configured ALS2 workflow, liberated gold-bearing contacts enter the project’s acidless separation stage under controlled conditions. Parameters such as separation-medium concentration, temperature, contact time and dosage are set for the coating and base-metal combination. The objective is to transfer and concentrate gold into a recoverable fraction while copper, nickel, steel and other fixture metals remain in a residue that can be characterised for recycling.

The gold-bearing fraction is then separated from the residue and routed to a controlled recovery stage. Reduction or precipitation, depending on the validated ALS2 configuration and refinery specification, concentrates the metal into an intermediate product. This material still requires assay, responsible-sourcing checks and refinery finishing before it becomes bullion. Keeping those final steps outside the compact installation lets the site concentrate on separation and product preparation.

Factor Typical acid-based route ALS2 acidless separation route
Separation chemistry Concentrated mineral acids often dissolve several metals together Application-specific acidless chemistry targets precious-metal recovery
Operator exposure Corrosion, acid storage, spill control and resistant equipment dominate Removes mineral-acid handling tasks while retaining controls for all process media
Waste and water Neutralisation can produce salt-rich sludge and additional liquid handling Residue and wash-water burdens depend on the feed, chemistry and recovery performance
Footprint Commonly integrated into larger centralised refining plants Compact format suits aggregated precious-metal-bearing e-waste streams
Material fit Works for varied feeds where scale offsets reagent and effluent costs Particularly useful where liberation and selectivity determine batch value
Saleable output Gold-bearing liquor proceeds to precipitation, smelting or electro-refining Concentrated intermediate proceeds to assay, responsible-sourcing review and refinery finishing

This comparison does not make ALS2 impact-free. Reagent manufacture, energy use, wash water and residue treatment still require accounting, while outputs such as copper or nickel need characterisation before recycling. A credible mass balance reports gold recovered, gold lost, reagent consumption and the destination of every solid fraction. Without that evidence, a compact installation is not automatically a cleaner or more profitable one.

What changes at plant scale

The acidless route changes several parts of plant operation. Operators can avoid many tasks built around corrosion, acid storage and large-volume neutralisation, reducing the burden associated with those activities. The ALS2 media, dust from dismantled fixtures and any mechanical preparation steps still require their own safety controls, protective equipment and workplace procedures.

Selective separation can also preserve more value from a small batch by avoiding unnecessary losses of gold into mixed residues. Compact equipment allows several e-waste aggregators to ship sorted contacts to one processing hub. This model suits Australia’s dispersed repair, manufacturing and laboratory networks better than requiring every organisation to construct and operate a full precious-metals refinery.

Horizon 2020 support for ALS2Project has advanced the technology within a European research and innovation programme. For Australian adopters, that research history demonstrates development effort, but it does not guarantee local performance. Feed chemistry, operator competence, plant scale and downstream residue requirements should still be confirmed through a representative pilot under Australian conditions.

The Australian market and operating context

Melbourne’s advanced manufacturing, aerospace and biomedical laboratories, together with Sydney’s electronics repair and refurbishment networks, are realistic sources of retired fixtures. These organisations can accumulate obsolete test gear for years, including connector-rich boards with recoverable pogo pins. A scheduled take-back and sorting programme can reveal valuable assemblies before they are mixed into lower-grade electronic waste.

Australia’s urban-mining sector around the Gold Coast and Brisbane already demonstrates the value of aggregating small quantities of metal-bearing material. Repairers, engineering workshops and equipment traders can apply the same model to test fixtures, provided that precious-metal-bearing contacts are identified and kept separate from ordinary scrap.

State policy strengthens the case for documented recovery. NSW and Victoria channel electrical and electronic waste away from general waste through dedicated collection and licensed processing routes, while local council services handle smaller loads. For an Australian recovery business, records connecting the fixture owner, collector, processor and refiner can therefore support both regulatory compliance and market claims about recycled material.

Trade adds another layer. Australia imports used electronics and test equipment, and some sorted e-waste is exported for specialist treatment. The Australian Customs Service requires declarations consistent with the goods and movement, while the Waste Export Prohibition framework may also apply to listed waste. Before any fixture or residue crosses a border, an importer or exporter should confirm classification, permits and recordkeeping rather than assume the material is ordinary scrap.

A practical validation and recovery plan

Start with one clearly defined fixture batch and a written objective for gold recovery. Record the connector types, mass of liberated contacts and initial gold estimate, then conduct independent assay on a representative subsample. This creates a reliable denominator for measuring recovery and shows whether the selected ALS2 configuration suits the coating and underlying alloy.

The pilot should then track more than recovered gold. Operators need measurements for reagent consumption, contact time, liquid and solid losses, worker exposures and the composition of residual copper, nickel and steel fractions. A representative product sample should move through assay and refinery assessment to confirm that the intermediate meets the buyer’s specification and responsible-sourcing requirements.

For commercial deployment, the recovery plant should connect fixture collectors, sorters, licensed waste handlers and an accredited Australian refinery through documented handovers. Batch records must satisfy Australian workplace, environmental and waste-management requirements, while operating procedures address spring handling, dust control and chemical storage. Capacity should expand only after the pilot establishes stable economics, reliable residue outlets and a market for the gold-bearing intermediate.


The next step is a small, measurable trial rather than a full plant commitment. Gather several fixture types, document the gold finish, photograph and weigh the pogo pins, and select a representative sample for independent assay. That evidence gives Ikoi S.p.A. and ALS2Project a defensible basis for designing a safe separation test.

Bring the batch, expected volumes and assay results to a technical review with Ikoi S.p.A. The review should assign responsibility for process chemistry, worker safety, residue classification, Australian waste movements and refinery handover. A successful pilot turns retired test fixtures into a traceable gold-recovery stream that supports circular electronics, safer workplaces and a stronger domestic recovery economy.