How ALS2 recovers gold from rotary switch contacts

Rotary switch contacts are small components with an outsized role in test equipment. They sit inside rotary selectors and switches used in instruments such as multimeters, oscilloscopes, power supplies and industrial test gear. Their contact surfaces are often gold-plated copper or silver alloys because gold carries current reliably, resists corrosion and keeps electrical contact resistance low. As switches age, the plating wears, becomes scratched or is covered with dust and oxidation products, so a stream that once looked like ordinary electronic scrap can carry a valuable metal coating.

For ALS2Project, this type of low-mass, high-value residue is a practical application for acidless precious-metals separation. Ikoi S.p.A.’s technology, supported by the European Union’s Horizon 2020 research and innovation programme, recovers precious metals from electronic waste and waste electrical and electronic equipment (WEEE) without relying on the corrosive acid leaching used in conventional refining. Applied carefully to rotary switch contacts from test equipment, the approach can turn a dispersed collection problem into a concentrated gold-recovery stream, provided the material is identified, liberated and tested.

The value hidden in test equipment

Gold plating does not mean every switch contains commercially recoverable gold. Contact designs vary by instrument model and age, and some use silver, nickel, palladium or mixed coatings rather than pure gold. A credible business case begins with representative sampling and elemental analysis. The result should establish gold content alongside silver and palladium, since these co-products can materially change the economics for Australian operators.

In Sydney and Melbourne, repair shops, laboratory-equipment refurbishers and commercial IT asset-disposal teams regularly encounter old test gear. Their challenge is collection: a handful of switches from one instrument is awkward to sell, but a consolidated stream from many instruments can be worth processing. Across Australian council e-waste programs and licensed recycling networks, material is usually weighed in kilograms or tonnes, whereas precious-metal value is quoted in AUD per troy ounce. That difference makes careful sorting and traceability valuable even before recovery begins.

For operators in Brisbane, the Gold Coast and other Queensland centres, the prospect is broader because mining, field maintenance and resources laboratories use substantial quantities of test and measurement equipment. Retired portable analysers and communication testers can enter mixed e-waste streams. An ALS2-based route does not remove the need for local logistics, but it offers a way to concentrate the metal value that is otherwise lost when rotary contacts are mixed with plastic housings, circuit boards and general ferrous scrap.

Preparing contact-rich feed for separation

The first stage is controlled dismantling rather than bulk shredding. The aim is to expose the rotary switch assembly without losing the small contact fingers or the fine particles knocked from them. Technicians can remove the instrument casing, knob, shaft and plastic carrier, then separate the gold-plated contacts where the construction allows. Integrated assemblies may need careful tool-assisted opening. Heat should be avoided because it can smear or oxidise the plating and introduce contamination from plastics, solder and base metals.

After liberation, the metal fraction is sieved and, where necessary, size-reduced. A controlled crushing step can detach remaining coating material, but indiscriminate grinding can mix gold-bearing fines with copper and steel. Cyclones, magnetic separation or other standard sorting steps may be used to remove obvious contaminants, while filters and dust controls recover fine material. For this application, ALS2 should receive a clean, reasonably uniform and traceable contact-rich stream rather than a mixed load containing cables, batteries or large plastic parts.

Each batch then needs mass balancing and an assay before treatment. Operators should record the source equipment, gross weight, recovered contact weight, moisture level and metal grades. This is especially important when batches from different facilities are blended to obtain enough material for a campaign. A representative 100-kilogram shipment from a recycler, for example, can hide wide variability that was present in several thousand individual switches. ALS2’s process development must be matched to that actual feed rather than to the best-looking sample.

How the acidless ALS2 route works

At the public process level, the ALS2 route has three connected jobs: liberate the precious-metal-bearing material, separate it selectively without mineral-acid digestion, and collect the enriched stream while keeping other materials available for controlled follow-up. Prepared contacts enter a controlled separation stage, where process conditions act on the liberated metal fraction. The goal is to partition gold-bearing material from the bulk of copper, nickel, silver-bearing plating and other residues, rather than dissolve every component indiscriminately.

The defining feature is the absence of an aqua-regia-type leach. Acid-based refining attacks the feed with strong mineral acids, then requires careful washing, gas control and treatment of acid-bearing residues. ALS2 instead uses its acidless selective-separation approach, with operating conditions and equipment configured for the selected feed. This can reduce corrosive exposure and the risk of toxic acid fumes, although acid-free does not mean risk-free: dust, rotating machinery, heavy metals, heat and any process reagents still need workplace controls, safety data sheets and suitable personal protective equipment.

The separated output can then be handled as a gold-enriched intermediate plus base-metal and process residues, which are sampled separately. A finishing or polishing step may be needed to meet a buyer or refiner’s specification; the exact route depends on the ALS2 configuration and feed composition. Operators interested in the technology’s development path can review ALS2 project updates for research, validation and scale-up announcements, then request a feed-specific technical discussion rather than assuming the headline recovery rate applies to every switch.

Fitting ALS2 into Australian operations

Australian deployment also means adapting the business, not just importing a vessel and a recipe. Sydney and Melbourne offer dense feedstock and technical-service networks, but space, power, ventilation and safe chemical storage can be expensive. A modular ALS2 installation suited to a compact precious-metals recovery plant should fit the site’s throughput and be skidded around local infrastructure. Equipment suppliers commonly work in metres and flow rates in litres per minute, while process temperatures are specified in degrees Celsius, so those conventions should be retained in commercial and engineering documents.

Queensland’s resources sector may provide a strong secondary market for recovered material, particularly through assay and refining channels serving the Gold Coast, Brisbane and regional operations. However, a remote mine or council depot in Western Australia faces freight costs that can erase the value of a small batch. Consolidating contacts at a metropolitan hub before shipment, or placing recovery close to a dependable source, usually makes more sense. The commercial comparison must include transport, insurance, weighbridge variations and the cost of returning residues.

Regulation and end-of-waste criteria are equally local. Australia’s National Waste Policy, state and territory implementation, council collection rules and licensed e-waste processor obligations determine how a stream can be classified and transferred. Export controls and chain-of-custody requirements also matter when material crosses state borders. A residue that is harmless in a European pilot still needs assessment under Australian environmental and workplace-health requirements before it is sold or landfilled, while a gold-rich product may need an accredited refiner to satisfy traceability and purity specifications.

Horizon 2020 support provides a strong foundation for the technology, but it is not a substitute for Australian trial work. A representative pilot should measure recovery, reagent consumption, water use, labour requirements and residue generation under local operating conditions. It should also answer practical questions a recycler will ask on the shop floor: Can the system tolerate a batch containing mixed switch ages? What maintenance is needed between campaigns? Can the gold-enriched output reach a refinery without an extra chemical bath? Those answers determine whether ALS2 is a useful processing option or merely an interesting laboratory result.

Comparing routes and taking the next step

Acidless separation should be judged on the whole flowsheet, not on the absence of acid alone. A process can avoid aqua regia yet still create washwater, contaminated filters or metal-bearing sludge. Likewise, a high-grade gold fraction has limited value if the plant is too small, the feedstock is inconsistent or downstream logistics are poor. The relevant benchmark is recovered value per tonne, total operating cost, operator exposure and the quality and traceability of the final residue and product. A concise comparison helps separate the technical claims from the operating realities:

Consideration ALS2 acidless approach Conventional acid-based refining
Core treatment Selective separation without mineral-acid digestion Strong-acid dissolution, often using aqua regia
Operator exposure Lower corrosive-acid burden, with other hazards still controlled Significant corrosive-liquid, spill and fume risks
Waste streams Gold-enriched fraction plus separately managed base-metal and process residues Acidic washwater, salts, sludges and off-gas treatment
Feed preparation Benefits from liberated, sorted contacts; mixed feeds require assay-based routing Can accept broader feeds but consumes more reagent on unwanted material
Plant footprint Designed for modular, compact precious-metals recovery plants Often requires more substantial acid-handling and abatement infrastructure
Commercial caveat Requires feed trials, residue assessment and possibly downstream finishing Refining routes are mature but hazardous-material and disposal costs can be higher

Australian operators can begin with a practical trial: isolate rotary contacts from representative test equipment, document their weight and assay, and use those results to request a feed-specific ALS2 feasibility assessment. Recyclers, refurbishment businesses and mining-service suppliers can then scope a pilot with Ikoi, compare the recovered value against collection and treatment costs, and verify residue handling under Australian rules. That pathway can turn a scattered return stream into a measurable circular-metals operation, with gold recovered where the equipment was serviced rather than simply disposed of.