Platinum recovery from furnace heating coils with ALS2

Spent heating elements from high-temperature furnaces are often treated as awkward scrap, yet their resistance alloys can contain valuable platinum-group metals. A retired coil may combine platinum or platinum-rhodium wire with nickel, iron, copper, ceramic insulation, steel sheaths and fabrication residues. The task begins with identity and segregation, not with a refining bath. This matters to how ALS2 handles platinum from heating element coils in high-temperature furnaces: every batch needs characterisation before an acidless separation route can be selected and verified.

ALS2Project, led by Ikoi S.p.A., presents acidless separation technology for recovering precious metals from electronic waste and waste electrical and electronic equipment (WEEE) recycling streams. The European Union’s Horizon 2020 programme has supported the project’s research and innovation work, while the intended commercial setting is a compact precious-metals recovery plant closer to waste sources. ALS2 should be viewed as a configurable separation platform, however, not a guarantee of identical recovery from every alloy or component.

From furnace hardware to a managed feed

Retired elements can arrive from laboratories, foundries, glass and ceramics plants, and specialist equipment builders. In Melbourne, universities and engineering workshops often strip usable metal from old kilns and furnaces before the balance becomes general scrap. The first check is whether the component is a platinum-bearing resistance element at all; platinum liners, thermocouples, nickel-chromium coils and ceramic fibre parts must not be treated as equivalents. Supplier records and the furnace’s maintenance history provide the starting point.

The next step is a controlled dismantling and chain-of-custody process. Elements should be cooled, electrically isolated and logged against their source before leads, ceramics, supports and steel are removed. Fine platinum wire can be lost during aggressive stripping, while a cutter can contaminate the fraction with iron. A trained technician should therefore separate recoverable metal using methods suited to the construction, retain representative pieces and record rejected material by weight.

Preparing a reliable separation feed

Preparation determines whether a separation chemistry sees a useful target or a mixed, inconsistent parcel. Depending on the element, controlled shredding, cutting, screening and magnetic or eddy-current separation can enrich the platinum-bearing fraction. Ceramic remains may need a distinct removal step. These operations are not automatically part of every ALS2 configuration, but they can form the receiving and conditioning section of an integrated flowsheet.

Feed management also protects recovery performance. A laboratory assay should identify the alloy and its platinum-group metal content, while mass balance reveals how much value sits in the selected fraction. Platinum can resist common oxidising acids, so a gentler bath alone does not ensure fast dissolution; phase, particle size and alloy condition matter. ALS2 addresses the feed as a system, linking characterisation and conditioning to the selected acidless separation conditions rather than assuming every platinum stream behaves alike.

The ALS2 separation pathway

At project level, the ALS2 route is best described as a controlled sequence: verified feed intake, batch conditioning, selective separation, product washing or dewatering, and final recovery of a concentrated precious-metal fraction. The exact unit operations and operating parameters depend on the material being processed. Public descriptions of the technology support the broader claim that mineral-acid refining can be avoided, but a plant still needs a feed-specific recipe, instrumentation and a validated separation protocol.

During selective separation, the process is designed to move the target metal away from the bulk of iron, nickel, copper and ceramic material under conditions that do not rely on a conventional acid circuit. That distinction is important for operators: acidless does not mean chemical-free, pressure-free or risk-free. Solvents, heat, mechanical action and electrical equipment may still be present, and any recovered fraction must be dried, weighed and assayed before it is sold or returned to a metal stream. Residues also require analysis and an approved destination rather than being assumed harmless.

Comparing acid-based and acidless refining

The choice is not simply acid versus no acid. Conventional and ALS2 routes must be compared for a particular feed, scale, workforce and waste-treatment arrangement.

Consideration Conventional acid-based refining ALS2 project proposition
Chemical burden Acid digestion and neutralisation can create corrosive reagent and salt loads Acidless separation is intended to reduce dependence on mineral-acid refining
Equipment Acid-resistant tanks, linings and fume systems may be required A compact flowsheet may suit distributed WEEE and industrial-waste recovery
Worker exposure Acid handling adds risks from vapour, splashes and spills Reduced acid exposure is possible, although the remaining hazards still require controls
Water and residues Neutralisation can increase liquid effluent and metal-bearing sludge Process configuration can change the water and residue profile, but both still need management
Feed response Mature for some feed types but highly dependent on chemistry Performance must be established for each alloy, impurity profile and batch size
Commercial fit Appropriate where suitable refining infrastructure already exists Potentially useful near waste streams where a small, modular plant is preferable

The project’s advantage is the combination of acidless separation and compact deployment, rather than a blanket claim that every acid-based refinery should be replaced. A technical trial should compare recovery, reagent consumption, water use, labour, residue volume and saleable product value against the operator’s current route.

Safety and environmental controls

Removing a coil is only the visible task. The job may involve hot work, sharp strip, ceramic fibre, dust, electrical isolation and potentially contaminated WEEE. Safe Work Australia guidance and site-specific risk assessments should cover manual handling, ventilation, guarding and maintenance of shredding or separation equipment. Coils should not be cut or crushed while energised, and dry dust controls should be in place before opening an element.

Acidless operation lowers one important exposure class; it does not remove the need for occupational hygiene. Fine metal, hot process stages, electrical systems, pressure vessels and chemical reagents may still be present, while mixed e-waste can contain lead, mercury or brominated flame retardants. Pre-screening, batch controls, personal protective equipment, interlocks and documented emergency procedures remain essential. Peripheral links such as an external webpage can be recorded in a research appendix, but only accredited analyses and supplier evidence should inform the recovery decision.

Sustainability claims should be demonstrated with measured water, energy, consumable and residue data, not simply the absence of acid. A full assessment should include transport to and from the plant, reagent manufacture, worker safety, downstream metal refining and final residue treatment. That life-cycle view is especially important in Australia, where long distances between mines, workshops and treatment facilities can offset the environmental benefit of recovering more metal locally.

Commercial fit for Australian operations

Australia’s urban e-waste streams provide a practical test for ALS2’s WEEE applications. Melbourne and Sydney have substantial collections of discarded electronics and access to specialist dismantlers, while landfill levies in Victoria and New South Wales make material diversion more attractive to councils and businesses. Collection rules still differ between local governments, so a plant needs a dependable feedstock contract and a clear definition of accepted electrical and electronic equipment.

Regional opportunities come with different logistics. Kalgoorlie-Boulder in Western Australia has mining, assay laboratories and maintenance workshops that may generate small, valuable quantities of platinum-bearing equipment; secure transport and chain of custody matter more than headline metal prices. Tasmania’s island freight can make a large central refinery costly, increasing the potential value of a modular unit, provided residues have an approved off-island route. Australian crews commonly speak of a furnace “run”, a “plant” and a “job”, and a proposal should use that practical language while stating assay results, throughput and responsibility boundaries clearly.

A business case must also tolerate platinum-price volatility, assay uncertainty and variable feed quality. Recovering one tonne of mixed coils may be uneconomic if operators sort only after the load reaches the plant. A better model combines several qualifying waste streams, pays for secure collection, and defines acceptance criteria and residue responsibility before a furnace crew delivers the material. The result can be a closed-loop service in which platinum returns to industrial supply instead of leaving Australia’s circular economy.

Moving from trial feedstock to recovery plant

The first commercial step is a representative trial, not a full plant commitment. Collect a documented batch of retired coils, identify their alloys, preserve traceability and obtain independent assay and mass-balance results. Use those data to model the smallest ALS2 configuration that can handle the expected feed without creating an unmanageable residue stream.

Ikoi and the ALS2Project team can then test the proposal against feedstock behaviour, workplace safety, transport, environmental obligations and local processing costs. A trial should produce clear pass criteria: recovered value, product quality, water and energy use, labour requirements and a documented route for every residue. This evidence turns a promising separation idea into an investment that Australian operators can audit.

Start by sending Ikoi and ALS2Project a short feedstock dossier containing source descriptions, photographs, approximate weights, available assay data and the intended collection region. From there, agree a representative sampling and trial plan, then build the business case around verified outputs rather than projected headlines.